With summer quickly approaching rising humidity levels can compromise your wood floor installations if not accounted for.
Why test for moisture content of slab before laying hardwoods.
Qualitative moisture tests electrical impedance test and electrical resistance test moisture meter follow meter manufacturer s instructions.
Concrete slabs and floors can be excellent subfloor surfaces for tile and other floor coverings but too much moisture in the concrete can cause problems with flooring installations.
Before moisture testing begins the concrete slab must be a minimum of 30 days old.
But before you begin it s important to understand that moisture measurement and management is crucial to both the concrete slab and also the hardwood flooring.
The american society for testing materials astm has several standard tests for measuring moisture levels in a concrete slab.
How to check moisture content in concrete floors.
You must test the concrete slab for excessive moisture.
How to do a moisture test for concrete slabs.
Test for dryness new concrete is heavy with moisture and it must be a minimum of 30 days old before moisture testing begins.
Testing concrete for moisture astm f2170 stipulates the use of in situ probes to determine the moisture condition of a concrete slab at the time that it will be sealed or covered by flooring material.
Dry the room and test again optional if moisture appeared on the top side of the plastic dry out the room with a dehumidifier or other method then retest the floor with the plastic squares.
Let s look at how moisture affects concrete before moving on to moisture s effect on wood flooring.
If your subfloor is above 12 moisture dry out the subfloor before installing hardwood floors.
Determining moisture content of both the wood flooring and the subfloor is an important part of quality control in the flooring installation process.
The normal moisture content of wood or emc varies from 7 19 depending on the rh in the air.
The hardwood flooring s moisture content mc should be in balance with its surrounding ambient environment to support the.
Slabs less than 60 days old are generally too wet to install floors.
For woodworkers who build cabinets fine furniture musical instruments dishes toys decorative art boat restoration or various other wood products the acceptable wood moisture content normally ranges from 6 to 8.
Use moisture meters designed specifically for concrete moisture testing.
Concrete slabs wood subfloors and the wood flooring placed above a slab or subfloor are by their very nature porous.
Therefore it s advisable to have a floor tested for moisture content prior to installing flooring or moisture barriers.
You can combine them to get the best read of your moisture conditions.